- A complete selection includes requirements, RFP, demonstrations, evaluation and recommendation.
- CAD $25,000 to $60,000 is PlanAxion's indicative full-selection planning range, not a market average or quotation.
- Software, implementation, integration and migration cost extra.
Votre projet ERP est-il prêt?
30 critères, 6 dimensions. Repérez les risques avant de choisir votre ERP.
Évaluer ma préparation8 à 12 min · Score immédiat
A complete, independent ERP selection for a mid-sized Quebec organization can be planned at approximately CAD $25,000 to $60,000. The scope, number of processes and legal entities, number of platforms and implementation partners evaluated, and the work already completed internally all affect that estimate.
This is not the cost of the ERP system or its implementation. It covers the decision work before signing: requirements, vendor shortlist, request for proposals, scripted demonstrations, scoring matrix, implementation-partner assessment and a documented recommendation.
This CAD $25,000 to $60,000 range is an indicative PlanAxion planning assumption for a complete selection mandate, not a statistically measured Quebec market average or a binding quotation. Actual fees are determined after scoping.
Preparing to choose an ERP? Review our independent ERP selection approach, conducted on the buyer's side with no software-resale commissions.
What should you budget for ERP selection?
Not all engagements called “ERP selection” cover the same deliverables. A limited needs assessment or initial software review may cost CAD $5,000 to $25,000 according to a published Canadian provider estimate. That is a narrower scope than a full, multi-department selection. A complete selection usually costs considerably more, and multi-entity or highly regulated programs can exceed CAD $60,000.
For example, a finance-only shortlist with well-documented requirements is not comparable to a manufacturing selection involving production, inventory, quality, purchasing, integrations and several legal entities. Always request a list of included deliverables before comparing quoted fees.
What is included in a complete ERP selection mandate?
- Decision scoping. Business objectives, boundaries, critical workflows, constraints and success criteria.
- Requirements and weighting. Functional, technical, security, compliance, reporting, data and integration needs.
- Software shortlist. Eliminate platforms that do not meet essential requirements before detailed demos.
- Structured RFP. Require the same information, assumptions and response format from each vendor. See our ERP RFP approach.
- Scripted demonstrations. Vendors show how the software handles your real scenarios rather than relying on a standard sales demo.
- Weighted evaluation. Compare coverage, architecture, five-year total cost, delivery risk and evidence. Use our ERP selection scorecard.
- Implementation partner assessment. Named team members, relevant experience, method, availability and responsibilities.
- Recommendation and negotiation foundation. Document trade-offs, exclusions, contract assumptions and residual risks before signing.

What makes selection fees increase?
Number of business processes
A finance-only scope differs substantially from a manufacturer covering material requirements planning, production, quality, warehousing, maintenance, EDI, projects and consolidation.
Number of legal entities and sites
Each entity may introduce distinct tax, reporting, operational, language or currency requirements, as well as additional participants and data sources.
Number of software vendors and integrators
A disciplined shortlist reduces time spent on options that do not meet critical requirements. Evaluating more candidates is not automatically better.
Internal preparedness
Well-documented processes, clear decision owners and accessible data make evaluation more efficient. Our ERP readiness assessment can help identify preparation gaps before approaching vendors.
Data and integration complexity
WMS, MES, EDI, CRM, payroll, ecommerce, banking and sector-specific systems can turn an apparently simple feature comparison into an architecture decision.
Why can a low-cost selection end up costing more?
The problem is not a low consulting fee in itself. It is assuming two proposals cover the same work when they do not. Check whether the engagement includes operations workshops, weighted requirements, scripted demos, total-cost comparison, separate integrator evaluation, relevant references, and documented contract exclusions.
If that work is postponed until after contract signature, it may be harder and more expensive to resolve misunderstandings.
Should we hire an advisor or manage selection internally?
An internal team can run a credible selection if it has sufficient capacity, an established method and the ability to challenge vendor assumptions. External independent advice is particularly useful when multiple departments are affected, proposals are difficult to compare or nobody on the team has recently managed a complete ERP selection.
The advisor should bring decision structure and independence, not replace management's final decision. You can speak with a client-side ERP advisor to discuss the scope and risks.
How does PlanAxion estimate a selection mandate?
PlanAxion starts with the processes and legal entities in scope, work already done, software and implementation firms to compare, architecture and data requirements, compliance obligations and the level of documentation required. These assumptions inform a project-specific fee proposal.
PlanAxion does not resell ERP licences or receive vendor commissions. The business making the ERP decision pays the advisory engagement.
Need a project-specific estimate? Explore our selection service or describe your project.
Frequently asked questions
How much does independent ERP selection cost in Quebec?
For mid-sized organizations, PlanAxion uses CAD $25,000 to $60,000 as an indicative planning range for a complete independent selection. A limited scoping mandate can be lower; complex multi-entity programs can cost more. The fee depends on the agreed deliverables.
Does that include ERP software?
No. Licences, implementation, integrations, data migration, training and ongoing support are budgeted separately.
Is a fixed price better than hourly consulting?
A fixed fee is useful when scope and deliverables are well defined. Time-and-materials may be appropriate when requirements and workload remain uncertain.
How many ERP platforms should be compared?
For detailed scripted demonstrations, three or four credible candidates often provide sufficient comparison without overloading the internal team.
How long does ERP selection take?
Typically several weeks or longer, depending on internal readiness, the number of departments, vendors and integrators, and the complexity of the decision.
- Gestisoft, ERP Business Consultant Explained (2026): publicly stated CAD $5,000 to $25,000 for a narrower business-assessment, selection or process-review engagement. Not directly comparable to a complete multi-department selection.
- Gestisoft, Independent ERP Consultants (2026): indicative CAD $40,000 to $90,000 for mid-market full selections, illustrating the impact of different scopes and assumptions.
- Tech Vendor Index, ERP Vendor Selection Consulting (2026): broader international estimates; do not directly substitute for Quebec CAD pricing.
- PlanAxion, Coût d'une sélection ERP au Québec: PlanAxion's indicative planning framework.








